Contract 23380 REL 1: 1988-053-15 EXP HRPP EXPANSION
Project Number:
Title:
Hood River Artificial Production-Parkdale
Stage:
Complete
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
23380 REL 1
Contract Title:
1988-053-15 EXP HRPP EXPANSION
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
The Hood River Master Plan and associated analyses will be updated to include the most recent information and to be adequately detailed for consideration by the NPCC and ISRP.  The revised plan will also acknowledge the removal of Powerdale dam and adult fish trap, necessitating substantial changes in Hood River Production Program management and infrastructure.  The dam is slated for removal in 2010, and many changes in the program will need to be underway and/or completed prior to dam removal.  The dam is currently used as a cornerstone to the HRPP and provides a valuable management and research tool.  Prior to dam removal, additional facilities such as alternative trapping sites, and management strategies will need to be adjusted to adapt to the new configuration of the river and the project.

This work will address the following primary objectives:
    Utilize co-managers adult production goals and review production assumptions to devise requirements for all facilities.
    Evaluate feasibility of alternative sites and methods of broodstock collection and escapement monitoring after the decommissioning of Powerdale Dam including a single or multiple sites.
    Utilize co-managers adult production goals to conceptual design and/or engineer changes to Parkdale Fish Facility to support desired program production goals if necessary.
    Produce a revised Hood River Master Plan document describing adjusted program goals with feasibility, conceptual designs and costs associated with proposed alternatives.

Two additional steps are required in the Council's 3-Step Process for the approval of new fish culture facilities or greatly modified fish culture programs.  The work covered by this SOW includes production of a Revised Hood River Master Plan suitable for initial Council/ISRP review.  Review by the co-managers and BPA will determine adequacy of this product to be submitted to NPCC.  Additional funds will be negotiated with the contractor contingent upon the amount of additional work required to obtain approval of the Master Plan and permission to proceed to Step 2.
Account Type(s):
Expense
Contract Start Date:
02/06/2006
Contract End Date:
05/31/2008
Current Contract Value:
$402,343
Expenditures:
$402,343

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Time and Materials
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Sarah Branum Bonneville Power Administration Yes COR stbranum@bpa.gov (503) 230-5115
Christopher Brun Confederated Tribes of Warm Springs No Interested Party cbrun@hrecn.net (541) 352-3548
Ed Donahue Fishpro, Inc. No Technical Contact ed.donahue@hdrinc.com (253) 858-5262
Sherry Jeffery HDR Engineering, Inc. Yes Administrative Contact sherry.jeffery@hdrinc.com (253) 858-5262
Jason Karnezis Bonneville Power Administration No Interested Party jpkarnezis@bpa.gov (503) 230-3098
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Mike McGowan Fishpro, Inc. No Supervisor mike.mcgowan@hdrinc.com (253) 858-5262
Keith Underwood Fishpro, Inc. Yes Contract Manager keith.underwood@hdrinc.com (253) 858-6142
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Nancy Weintraub Bonneville Power Administration Yes Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Project Administration A: 119. Manage Project and Subconsultants 05/31/2008 05/31/2008
Final conceptual design of 6 hatchery configurations B: 175. Rearing facilities conceptual design 08/31/2007 11/30/2007
Final conceptual design of up to 8 alternatives for collection facilities C: 175. Adult collection facilities conceptual design 08/31/2007 11/30/2007
Attend NPCC meeting to present master plan and review ISRP comments. D: 168. Council Coordination of 3 Step Process 05/09/2008 05/09/2008
Technical Memo summarizing decision making process & preferred alternative F: 175. Parkdale FF Feasibility & Conceptual Design for flood prevention 09/30/2007 09/30/2007

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 3 instances of WE 175 Produce Design
  • 1 instance of WE 168 Council 3-step Process: Step 1
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 3 instances of WE 175 Produce Design
  • 1 instance of WE 168 Council 3-step Process: Step 1

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage Project and Subconsultants
B 175 Rearing facilities conceptual design
C 175 Adult collection facilities conceptual design
D 168 Council Coordination of 3 Step Process
E 185 Periodic Status Reports for BPA
F 175 Parkdale FF Feasibility & Conceptual Design for flood prevention
G 132 Submit Progress Report for the period (MMM YYYY) to (MMM YYYY)